• Home
  • About GVP-SIRC
  • About Director
  • Projects
  • Collaborations
  • R&D Activities
  • Trainees & Mentees
  • Feedback
  • Contact Us
R & D Projects

S.No. Title of the Project Investigators Funding Agency Project Cost(INR) Date of Sanction/ Duration
1 Feasibility of detection of underwater hydrodynamic turbulence using optoelectronic techniques,
Ref. No. NSTL/SNS/CARS/GVP
Rao Tatavarti NSTL, DRDO
Ministry of Defence, Govt. of India
9,94,750 Aug. 25, 2011
12 months (Completed)
2 A study of the role of neutrophic factors, polyunsaturated fatty acids and their metabolites in the prevention of radiation and chemical induced damage to DNA in vitro and in vivo and cancer,
Ref. No. INM/TC/2519/2011
Rao Tatavarti
U.N. Das
INMAS, DRDO,
Ministry of Defence, Govt. of India
198,44,000 Dec. 22, 2011
36 months (Completed)
3 Coupling Sediment Transport Estimates from Numerical Modeling with Field Observations in Gulf of Mannar,
Ref. No. DNRD/05/4003/NRB/253
Rao Tatavarti
A.C. Narayana,
U of H
Naval Research Board (NRB),
Ministry of Defence, Govt. of India
49,39,200 August 25, 2012
29 months (Completed)
4 Design and Development of Optical Air Data System For Advanced Combat Medium Range Aircraft,
Ref. No. ADA/AMCA/93
Rao Tatavarti
P.Arulmozhivarman, VIT
Aeronautical Development Agency (ADA),
Ministry of Defence, Govt. of India
103,92,320 July 20, 2012
32 months (Completed)
5 Optimal Design of Marine Engine foundation for Vibration reduction,
Ref. No. NSTL/VSD/GVP/2030/OF
S. Ramakrishna Rao Tatavarti NSTL, DRDO,
Ministry of Defence, Govt. of India
6,72,000 Aug. 16, 2012
8 months (Completed)
6 Design of Tank Facility to Study Underwater Turbulence,
Ref. No. NSTL/UDT/CARS/2
Rao Tatavarti NSTL, DRDO,
Ministry of Defence, Govt. of India
3,25,000 Nov. 20, 2012
3 months (Completed)
7 Design and Development of a Photonic system for real time remote monitoring of wind and other air parameters,
Ref. No. CWET/2014/MoU
Rao Tatavarti CWET,
Ministry of New and Renewable Energy, Govt. of India
17,75,000 June 20, 2014
12 months (Completed)
8 Wave, Current and Sediment Measurements in the Nearshore Zone for Suggesting Measures for Mitigation of Vizag Beach Erosion,
Ref. No. IENG/SE-V/AE-I
Rao Tatavarti Visakhapatnam Port Trust
Ministry of Shipping, Govt. of India
8,50,000 February 23, 2015
6 months (Completed)
9 Structural Integrity Assessment using Indigenous Photonic System
Ref. No. File No 8-3/RIFD/RPS/Policy-1/2016-17
Rao Tatavarti AICTE 23,52,941 October 19, 2017
36 Months (Completed)
10 Indigenous Photonic System for Real Time Remote Monitoring of Air Quality
Ref. No. DST/TMD/CERI/Air Pollution/2018/004
Rao Tatavarti DST,
Govt. of India
69,80,504 July 15, 2019
18 Months (Completed)


Consultancy Projects

S.No. Title of the Project Investigators Funding Agency Project Cost(INR) Date of Sanction/ Duration
1 Design of Oil Cargo Berth at VPT,
Ref. No. AVRIPL/VSK/GVPCE-01/PRC/002
P.S. Rao AVR Infra, Chennai. 14,00,000 Nov 2010
24 months (Completed)
2 Verification and Validation of Structural Designs of the Proposed Deperming Facility at Visakhapatnam,
Ref.No. NSTL/1918/WT/EM/CONTRACT/CARS32
P.S. Rao
Rao Tatavarti
NSTL, DRDO,
Ministry of Defence, Govt. of India
7,53,318 July 2012
12 months (Completed)
3 Checking of the Designs of the General Cargo Berth in Outer Harbour, VPT,
Ref. No. VBGC/CAPEX/66
P.S. Rao Vedanta Group of Companies 1,30,000 Nov 2012
(Completed)
4 Carrying out Blast Induced and Construction Induced Ground Vibration Monitoring at Dighi Oil Storage Private Limited, Dighi Maharashtra,
Ref. No. DOSPL/DIGHI/DRT-01/PRC/005
Rao Tatavarti Dighi Oil Storage Pvt. Ltd. 1,12,658 April 2013
(Completed)
5 RMHS conveyor Gallery CC-3 and JH-15 collapsed structures at Jajpur Plant,
Ref. No. KPO/RMHS/LOI 135
P.S. Rao
P.Veerabhadra Rao
TATA Steel Ltd.,
Jaipur, Orissa
2,00,000 June 2013
7 months (Completed)
6 Consultancy Project for LMS International, Ref. No. LMS/GVP-SIRC dt: August 26, 2013 Sastry Vedula LMS India Engineering Solutions Pvt. Ltd., Chennai 2,16,036 August 2013
6 months (Completed)
7 For conducting pertinent hydraulic model studies for contemplated development of Naval facility at SBC (V), Visakhapatnam, Ref. No. SSID/GVP dt: July 4, 2014 Rao Tatavarti SS Infrastructure Development Consultants Pvt. Ltd., Hyderabad 10,00,000 July 2014
5 months (Completed)
8 Vibration monitoring of the Cenotaph Road Building for Structural Stability Assessment, Ref. No. SkyRide/GVP, dt: July 21, 2014 Rao Tatavarti SkyRide Tours and Travels,
Chennai
2,50,000 August 2014
1 month (Completed)
9 Structural stability study to facilitate erection of additional equipment on the terrace at Fortis Health Care, Mumbai, Ref. No. FHL/MUM/MUL/WO/R&M/33/2014-15 Rao Tatavarti Geomarine Consultants, Fortis Hospital,
Mumbai
1,00,000 November 2014
2 months (Completed)
10 Consultancy Project for HBL Power Systems Ltd.,
Ref. No. HBL/GVP-SIRC dt: January 01, 2016
Sastry Vedula HBL Power Systems Ltd.,
Hyderabad
13,50,000 January 2016
9 months (Completed)
11 Feasibility Studies on Photonic Systems for Environmental Monitoring
Ref. No. CATS/GVP-SIRC dt: March 09, 2016
Rao Tatavarti CASTLE Advanced Technologies & Systems (CATS), Nashik 20,00,000 March 2016
12 months (Completed) 
12 Feasibility demonstration of design and development of sensor for blade tip clearance measurements Rao Tatavarti GTRE, Bangalore 9,99,000 April 2016
13 Feasibility studies on photonic systems for Environmental Monitoring Rao Tatavarti CASTLE Advanced Technologies & Systems (CATS), Nashik 7,00,000 1st August 2017
(Completed)

 
                                                            Total Cost - Rs. 5,73,37,727/-

 
 
      
 
        

Copyright © 2016 GVP-SIRC. All Rights Reserved. Developed & Maintained by Data Centre, GVPCoE(A).